03 / 21
2019
Construction has begun on the 920m Danjiang Bridge in Taiwan, the world’s longest single-mast, asymmetric cable-stayed bridge.
© VA
Spanning the mouth of the Tamsui River that flows through Taipei, the Danjiang Bridge is integral to the infrastructure upgrading program of northern Taiwan.
The new bridge will reduce through-traffic on congested local roads by linking Highway 2 on the river’s eastern side with Highway 15, the West Coast Expressway (Route 61) and the Bali-Xindian Expressway (Route 64) on the western side.
© MIR
In reducing traffic by 30% on the existing Guandu Bridge 5km upriver, the Danjiang Bridge will significantly improve Taiwan’s northern coast traffic network and also enhance accessibility throughout the region with the Port of Taipei and Taoyuan International Airport.
The Tamsui River estuary is an important natural ecosystem flanked by the urban centres of Tamsui to the East and Bali to the west. The estuary is rapidly growing in popularity with both residents and tourists as a recreational area where people gather each day to watch the sun setting over the Taiwan Strait.
© MIR
The bridge minimises its visual impact by using a single concrete mast to support its main 450-metre span with dedicated road, cycle and pedestrian lanes. The design also accommodates future expansion of the Danhai Light Rail network across the Tamsui River.
A Sinotech Engineering Consultants and Leonhardt, Andrä and Partner joint venture with Zaha Hadid Architects, the bridge’s 200-metre mast is engineered to be as slender as possible.
© MIR
Positioned to optimise structural performance as well as views of the setting sun from popular viewing points along the riverbank, the mast’s location also avoids impeding the navigability of the river. This single-mast design minimises disruption to the riverbed in accordance with the enhanced protection programs of the estuary’s ecosystem as a nature reserve.
© MIR
Attending the ground-breaking ceremony, Taiwan’s President Tsai Ing-wen explained the new bridge will reduce the journey between Bali and Tamsui on either side of the river by 15 km, saving 25 minutes of travelling time for those crossing the river.
With a construction schedule of 68 months and budget of NT$12.49billion (US$405.2 million), the Danjiang Bridge is scheduled to open in 2024.
© MIR
Architect: Zaha Hadid Architects
Client: Directorate General of Highways, M.O.T.C.
Location: Taipei, Taiwan
Year: 2015 - 2024
Lenght: 920m (total) - 450 (longest span)
Design: Zaha Hadid, Patrik Schumacher
Project Directors (Competition): Charles Walker, Manuela Gatto
Project Architect (Competition): Shao-wei Huang
Design Associate (Competition): Paulo Flores
Lead Designer (Competition): Saman Saffarian
Project Team (Competition): Evgeniya Yatsyuk, Paul Bart, Sam Sharpe, Silviya Barzakova, Julian Lin, Ramon Weber
Project Director (Delivery): Cristiano Ceccato
Project Architect (Delivery): Shao-wei Huang
Project Team (Delivery): Carlos Michel-Medina, Chien-shuo Pai, Julian Lin, Elena Scripelliti
Project BIM Support (Delivery): Paul Ehret
Render: VA, MIR
Lead structural engineering consultancy and JV Partner: Leonhardt, Andrä und Partner (Leonhardt, Andrä und Partner, Beratende Ingenieure VBI AG , Germany)
Local engineering consultants and JV Partner: Sinotech Engineering Consultants (Sinotech Engineering Consultants, Ltd, Taiwan, R.O.C.)
Lighting designer: Chroma33 Architectural Lighting Design (Taiwan, R.O.C.)
[ VIEW MORE ZAHA HADID ARCHITECTS' PROJECTS ]
© MIR
© MIR
> View more architecture projects in Taiwan
> View more bridge design projects
© VA
© VA
© VA
© VA
Zaha Hadid Architects' Danjiang Bridge construction begin
03 / 21 / 2019 Construction has begun on the 920m Danjiang Bridge in Taiwan, the world’s longest single-mast, asymmetric cable-stayed bridgeYou might also like:
Recommended post: COMEX Pavilion by Gracia Studio