10 / 11
2021
Raimon Centre for Cultural Activities in Xàtiva by Ramón Esteve Estudio
The proposal for the new Cultural Centre in Xàtiva is based on highlighting the elements of the existing building, by recovering the historical characteristics of its architecture, both from a spatial, constructive and artistic point of view...
10 / 08
2021
Serie + Multiply unveil Super Low Energy residential development in Singapore
Jervois Mansion, Singapore's first low-rise Super Low Energy residential development. The project is inspired by the region's historic bungalow typology and is unique for its low-rise massing...
10 / 07
2021
Lantern House by Dick Clark + Associates
The resulting design steps the house back as it moves up the hill, using the landscape to activate the architecture and for nature to be experienced from each floor in a different way...
10 / 06
2021
STANDARD 69 Restaurant by Capó Studio
We planned STANDARD 69's concept as a gastronomic experience based in the product, with small sharing plates with flavors from around the world...
10 / 06
2021
KOA Apartment by Marty Chou Architecture
This is an atypical home. It is a space that reflects the life of a unique urban family in its current stage...
10 / 05
2021
Unveiling the Italian Pavilion at Expo Dubai 2020
Italy's Pavilion at Expo Dubai 2020 opens to the public as an experiment into reconfigurable architecture and circularity. The pavilion was designed by CRA-Carlo Ratti Associati and Italo Rota Building Office, with Matteo Gatto and F&M Ingegneria...
10 / 04
2021
Rhode Partners Breaks Ground on New Student Housing Project in Columbus, Ohio
Rhode Partners Breaks Ground on Firm's Third Mixed-Use Student Housing Project in Columbus, Ohio...
10 / 04
2021
Bay View Restaurant by Dick Clark + Associates
This project provides an amenity unique to the Horseshoe Bay area: a sleek, modern exterior coupled with expansive, comfortably sophisticated dining rooms...
10 / 01
2021
Gasteig HP8 Isarphilharmonie concert hall by gmp Architekten completed
After a construction period of just 18 months and within the budget of 40 million euro the Isarphilharmonie concert hall in timber module construction, with about 1,900 seats, has now been completed...